Construction of a diversion of the existing 330 kV double circuit OHL Novokahovska - Khersonska
The length of Construction of Diversion of the OHL330 kV Novokahovska – Khersonska is 15004 m and it pass within Kherson region through Berislav district and through Novokahovska city council. Construction of Diversion includes installation of 58 foundations and 58 towers.
Construction of a diversion of the existing 330 kV double circuit OHL Novokahovska – Ostrovska
Installation of OPGW and reconstruction of OHL 330 kV Novokahovska – Ostrovska from the tower №18 to SS 330 kV "Novokahovska" include the replacement of 19 towers, total length of reconstruction is 4158 m.
Reconstruction of SS 750 kV "Kyivska" with the installation of the second 750 kV.
As a result of the reconstruction, the capacity of the SS 750 kV "Kyivska", which is a key substation in the power supply of the central region of Ukraine, has been doubled.
The project “New construction of the Syvash 330/35 kV Substation"
The project “New construction of the Syvash 330/35 kV Substation in the Chaplinsky District of the Kherson Region for the delivery of power from the Syvash Wind Power Plant (wind farm) with a capacity of 250 MW".